
End-to-end management of administrative procedures.
CAEs are our main service, but the same platform processes legalisations, energy efficiency certificates and works permits. A software layer over the public administration, in any autonomous community.
One legalisation, a single form, all communities.
We work across all 17 communities, prepare the standardised forms, file the documentation with the Industry authority and resolve any quirk of each region. Depending on the community, we have registration receipts from 3 days after filing.
On the platform you fill in a very simple form, the same one for every community. An engineer no longer needs to spend 45 minutes to process a legalisation: an admin person with basic knowledge can get them done without any trouble.
17
autonomous communities
From 3 days
registration receipt
1 form
the same for all of Spain
Types of legalisations
- Thermal installations
- Aerothermal
- Air conditioningComing soon
- PV self-consumption
- Residential and industrial photovoltaics
- IRVE
- Electric vehicle chargers
Installation details
Type of service covered and emitters that distribute heating or cooling throughout the property.
* The real form autocompletes address and square metres from the catastral reference, and validates in real time whether the installation is industrial based on power and COP.
More than 20 manufacturers preloaded, ready to process.
Heat pumps, inverters and chargers from the main European and Asian manufacturers are preloaded on the platform with their technical datasheets. Forget about hunting for documentation unit by unit.





















Energy Efficiency Certificates prepared to extract the maximum CAE.
Issuance of single-type CEE, before and after an improvement, with national coverage. We design each certificate with the profitability of the associated CAE case file in mind.
Request a CEESingle CEE
Standard energy efficiency certificate for properties that will not undergo an improvement. Required for sale, rental and administrative procedures.
CEE before an improvement
Certificate issued before the improvement. It defines the property's baseline energy rating and makes it possible to quantify the savings achievable with the CAE action.
CEE after an improvement
Certificate issued after the improvement. It certifies the new energy rating and supports the CAE application with the official quantification of the savings achieved.
100% via an approved video-survey platform
We coordinate the technical visits from an approved video-survey platform. No physical travel for the technician — maximum agility and national coverage.
Technicians trained to maximise the associated CAE
Our technicians are trained to squeeze every last kWh of savings out of the certificate, optimising the profitability of the CAE associated with the case file.
Works permits and licences with any town council.
Works permits and responsible declarations with town councils across Spain, managed from the same platform. Before you start, you can request a free report with the works regulations and the IBI allowances in force in the municipality you're interested in.
- Works regulations: processing, ICIO and planning fees.
- IBI allowances: details and current bylaw.
- National coverage: more than 8,000 town councils.
Pay per use, per procedure. You only pay when we file it.
No lock-ins or fees. You open a free account, try the platform and only the procedure you actually file with the administration is billed.
- No fixed cost
- No monthly fee
- No cost per employee
- No cost per user
Pay per use, on filing the procedure
The charge is generated when the case file is filed with the administration. If we don't file, you don't pay.
For Key Account customers we negotiate bespoke packages with API integration and dedicated support.
Let's talk
Do you process renewable installations?
Tell us your volume and we'll design a tailored integration.
We serve everyone from small installer SMEs to large accounts with thousands of cases a year. We reply within 24 business hours.